M&E project

Clockwork Building Case Study

In August 2022, MS Maintenance Ltd received instructions from consultants and the building owner to remove all plant from the roof to allow for a …
In August 2022, MS Maintenance Ltd received instructions from consultants and the building owner to remove all plant from the roof to allow for a new roof membrane with 150mm insulation to be added, and all HVAC plant on the roof to be replaced or renovated, including the CWS tank.
post logo
Commercial property

8 Old Jewry Case Study

MS has held a maintenance contract at 8 Old Jewry since March 2018. We attend the site twice a week for planned preventative maintenance and …
MS has held a maintenance contract at 8 Old Jewry since March 2018. We attend the site twice a week for planned preventative maintenance and hold a comprehensive reactive callout service.
post logo
Regal house

Regal House Drainage Case Study

MS Maintenance was awarded the Building Services Contract at Regal House, in January 2021. Regal house boasts state-of-the-art finishes, fantastic natural light, a coffee bistro, …
MS Maintenance was awarded the Building Services Contract at Regal House, in January 2021. Regal house boasts state-of-the-art finishes, fantastic natural light, a coffee bistro, a gym and an in-house concierge, it is more of a lifestyle space than an office.
post logo
chiller

Chiller Replacement, Watford Case Study

MS carried out a chiller replacement project in September 2022 as part of an ongoing energy reduction plan. Following several discussions with the client, they …
MS carried out a chiller replacement project in September 2022 as part of an ongoing energy reduction plan. Following several discussions with the client, they requested Energy saving suggestions to reduce their building's EPC energy rating to a C. The Account Manager gave a detailed report on where significant savings could be made. He brought the chiller to their attention, it was no longer running efficiently and had come to the end of it's lifecycle.
post logo
regal house

Regal House Case Study

MS Maintenance was awarded the Building Services Contract at Regal House, in January 2021. Initially, at the point of inception, we provided a detailed building …
MS Maintenance was awarded the Building Services Contract at Regal House, in January 2021. Initially, at the point of inception, we provided a detailed building condition report to highlight a full overview of the assets on-site and their conditional status as well as recommendations for consideration/budget.
post logo
belmont house

Belmont House Case Study

MS acquired Belmont House, Uxbridge in December 2016. MS Maintenance has retained this contract over the following five years, despite the change in managing agent …
MS acquired Belmont House, Uxbridge in December 2016. MS Maintenance has retained this contract over the following five years, despite the change in managing agent three times. MS has made considerable reductions and cost savings in electricity at a 33.5% reduction and gas consumption at 77.8% in the last quarter through adjusting certain set points and time zones over the plant.
post logo
quote michaela

New Fetter Lane Case Study

In June 2020, MS was awarded a 3-year M&E contract as CBRE’s Building Services provider at 1 New Fetter Lane. MS supplies a full-time on-site, …
In June 2020, MS was awarded a 3-year M&E contract as CBRE's Building Services provider at 1 New Fetter Lane. MS supplies a full-time on-site, multi-skilled engineer that completes all PPMs to SFG20 standards and manage all reactive callouts.